Salem Division has notified en route diversion of following train services for Track Renewal Works being carried out at Coimbatore North railway yard, as detailed below.
1. Train No.13352 Alappuzha – Dhanbad Express, scheduled to leave Alappuzha at 06.00 hrs, will be operated via Podanur – Irugur, skipping Coimbatore Jn, on 21st September 2025. Hence, the train will have an additional stoppage at Podanur Jn. Temporary Stoppage Podanur Jn.(Arrival/ Departure): 12.17 hrs./ 12.20 hrs.
2. Train No.12678 Ernakulam Junction – KSR Bengaluru Express, scheduled to leave Ernakulam Jn at 09.10 hrs, will be operated via Podanur – Irugur, skipping Coimbatore Jn, on 21.09.2025. The train will have an additional stoppage at Podanur Jn. Temporary Stoppage Podanur Jn.(Arrival/ Departure): 12.47 hrs./ 12.50 hrs.
