Site icon PNI

DIVERSION OF TRAIN SERVICES

Salem Division has notified en route diversion of following train services for Track Renewal Works being carried out at Coimbatore North railway yard, as detailed below.

1.    Train No.13352 Alappuzha – Dhanbad Express, scheduled to leave Alappuzha at 06.00 hrs, will be operated via Podanur – Irugur, skipping Coimbatore Jn, on 21st September 2025.  Hence, the train will have an additional stoppage at Podanur Jn.  Temporary Stoppage Podanur Jn.(Arrival/ Departure): 12.17 hrs./ 12.20 hrs.

2.    Train No.12678 Ernakulam Junction – KSR Bengaluru Express, scheduled to leave Ernakulam Jn at 09.10 hrs, will be operated via Podanur – Irugur, skipping Coimbatore Jn, on 21.09.2025.  The train will have an additional stoppage at Podanur Jn.  Temporary Stoppage Podanur Jn.(Arrival/ Departure): 12.47 hrs./ 12.50 hrs.

Exit mobile version