Indian Railways has approved critical slope stabilisation, tunnel rehabilitation and bridge protection works on the Jammu-Shri Mata Vaishno Devi Katra section at a cost of 238 crore rupees. Railways Minister Ashwini Vaishnaw said the works reflect the government’s commitment to ensuring safe and reliable connectivity in some of the country’s most challenging terrains. He added that the works will strengthen the long-term safety and reliability of this strategically important section.
